Major Projects

 

       
 

MSD Alternative Solids Project (ASP)

Client/Owner: Metropolitan Sewer District (MSD)
Construction Mgr/GC: Black & Veatch Corporation / Alberici Construction Co. Joint Venture
Completion Date: 6/1/2003
Location: Louisville, KY

Project Summary:
In August of 2000 MSD began construction of the $64.6 million Alternative Solids Process (ASP) at the Morris Forman Wastewater Treatment Plant located in Louisville, Ky. MSD chose the Black & Veatch Corporation and J.S. Alberici Construction Co., Inc Joint Venture to design and construct a process to replace the existing Zimpro process to help reduce the majority of the odors at this plant. The joint venture chose to partner with Andritz-Ruthner, Inc. of Arlington, Texas to develop the high-tech process to meet the customers' needs. The parent company, Andritz Group, is based in Graz, Austria. Guarantee Electrical Company (St. Louis, Mo.), B&S Electrical Supply (Louisville office) and Henderson Services (Louisville office) partnered together to meet the demanding challenges of a $7 million design/build electrical contract that required an intense amount of co-ordination between the design team and the various contractors.

 
         
 
 

  Services Performed:

 
 
  Installation of the following:
two(2) 15 KV Switches
two(2) double ended substations 13.5KV pri/480V sec
eight(8) 480 volt Motor Control Centers
HVAC power and control
Allen Bradley Programmable Logic Controllers
Process control and instrumentation
Fire Alarm System
 
  Gas Detection System  
  Fiber Optic and CAT 5 communications  
  Emergency egress lighting  
  High Pressure Sodium Lighting  
         

 

 
 
 