$1 billion expansion of its global all-points air facility in Louisville. The project more than doubled the size of the sorting complex to 4 million square feet. Packages are routed through the system's 122 miles of conveyors in as little as eight minutes. The entire operation is expandable to accommodate up to 500,000 packages each hour.

 
         
 
 

  Services Performed:

 
 
480 Volt power distribution- Wing B
HID hi-bay lighting - Wing B
Fire alarm system - entire new hub
Lightning elimination system - entire new hub
CAT 3 telephone backbone - entire new hub
Horizontal structures cabling system utilizing CAT 6 - over 200 miles of cabling for data collection for new hub
Emergency power system - 100KW generator set
 
  Thousands of voice data outlets - entire new hub  
       
       
       
         

 

 
 
 